Gráficas Salaet, with a business history of more than 50 years, is one of the leading companies in the sector of the manufacture of products packaged in sustainable paper and cardboard packaging for the food industry. Salaet's management team decided to expand its facilities by building a new industrial building in Gandesa (Tarragona).
Our flooring manager studied and designed a customised composition to create the best concrete floor for the client. In this project, an HA-25 concrete floor was formulated with a thickness of 20 cm, reinforced with metallic fibres, incorporating additives and with a wearing course.
Once the concrete had been poured, spread, levelled using a high flatness machine and triple cured, the nano-technological lithium treatment was subsequently carried out with the RS ConcretePlus system, transforming the slab into a pavement suitable for industrial activity. This treatment improves the natural performance of the concrete, resulting in a durable and easy to maintain polished concrete surface, excellent for high performance paving.
This design was conceived to respect the working conditions and characteristics of the company, complying with the necessary regulations to carry out its commercial activity in a clean and safe environment, being less susceptible to the proliferation of harmful bacteria, obtaining the prevention of RAS on surfaces.
Thanks to all the team at Gráficas Salaet for once again placing their trust in RS Tecnología.